Inorganic chemical industry plants. Non-ferrous metallurgy plants
CHIMCOMPLECT ENGINEERING JSC
Featured Below Is A Gallery Of Some Of Our Resent Completed Projects

AURUBIS BULGARIA JSC - PIRDOP 2016/2017
Preliminary and Detailed design for installation and site communications for cooling of copper slag

NEOCHIM JSC - DIMITROVGRAD 2019
Project part MM - replacement of pump pos. H-35/1 and connection to existing pipelines

ASAREL MEDET JSC - PANAGYURISHTE 2017
ASAREL MEDET JSC -PANAGYURISHTE Selection and installation of a system for capturing metal pieces of GTL ST-6 in
Completed Projects
Inorganic chemical industry plants. Non-ferrous metallurgy plants
Inorganic chemical industry plants. Non-ferrous metallurgy plants
| Client | Type and capacity of the installation | Type of engineering service |
| ASAREL MEDET JSC - PANAGYURISHTE 2015 | Two new sorption columns in Unit “Sorption installation” | Conceptual solution, Detailed design and author's supervision |
| CONTOURGLOBAL-MARITSA-EAST 3 2015 | Chemical Storage. Storage for used oils - reconstruction and improvement | Detailed design |
| ASAREL MEDET JSC - PANAGYURISHTE 2015 | Reconstruction and Renovation of rooms in Building “Management 1”. Sarnafil Roof Hydro-insullation of Building “Management 1” | Conceptual solution and Detailed design Detailed design and author's supervision |
| TECHNOMETAL - SOFIA 2015 | Solvay Sodi JSC- Devnya - Calculations and Construction-Machine Documentation for Electro -Filter Metal Structure | Detailed design |
| AURUBIS BULGARIA JSC - PIRDOP 2015 | Installation for Deep Bleed Treatment Plant – 4-7.7 mª / hour | Detailed design |
| SNC LAVALIN / HARMONEE 2012 - KARDHDALY 2014 | Zinc Smelter Plant - Modernization and expansion. New Roasting Plant and Sulfuric Acid | Technical Design Basic design of Outotec |
| AGROPOLYCHIM JSC - DEVNYA 2014 | Improvements in MAP production in unit TSP/MAR/DAP | Detailed design Basic design of INCRO |
| AURUBIS BULGARIA JSC - Pirdop 2014/2015 | Bleed Treatment Plant for NiSO4 | Basic design |
| AURUBIS BULGARIA JSC - Pirdop 2013/2014 | Installation and commissioning of Fayalite filter-press in Flotation Plant – 200 000 ton per year. | Detailed design |
| CONTOURGLOBAL - MARITSA EAST 3 2014 | Fresh oils room - Reconstruction | Detailed design |
| TECHNOMETAL - SOFIA 2014 | Solvay Sodi JSC - Devnya. Mechanical-Constructive Documentation for Flash Tank and Distilation Flashing Tank -36m3 | Detailed design |
| ASAREL MEDET JSC - PANAGYURISHTE 2013 | Choosing and mounting of separating system for metal pieces from mineral ore class 35(40)+10mm | Detailed design |
| AGROPOLYCHIM JSC - DEVNYA 2013 | Cooler upgrade for Solex finished product | Detailed design |
| ASAREL MEDET JSC - PANAGYURISHTE 2013 | Movable Maintenance Hall for Cyclic Flow Technology II | Detailed design |
| MONTAJ COMPLECT ENGINEERING - SOFIA 2013 | Factory “Kremikovtzi” – fire fighting /FF/ water supply pipeline, FF tank and pumping station | Detailed design |
| AURUBIS BULGARIA JSC - Pirdop 2012/2013 | New fuel oil station - power supply anode furnaces- 2.2 t / hour | Detailed design |
| ASAREL MEDET JSC - PANAGYURISHTE 2012/2013/2015 | Reconstruction and modernization of Spill-room and dining room in mass-room at Administration block (total 2000 people/daily) | Basic and Detailed design |
| ASAREL MEDET JSC - PANAGYURISHTE 2012/2013 | New maintenance site for repairing of ore machines-area 5.4dkr | Detailed design |
| AURUBIS BULGARIA JSC - Pirdop 2012/2013 | Thickener with diameter 6m and binding connections to WWTP | Detailed design |
| CONTOURGLOBAL-MARITSA-EAST 3 2012 | Tank for emergency collection of chemical compounds and solutions, for discharging tank for FeCl3 – V=7m³ | Technical and Detailed design. Author's supervision |
| AGROPOLYCHIM JSC - DEVNYA 2011 | New unit for production of ammonium nitrate solution – 1250 ton/day | Detailed design - parts Technological and communications /piping/, Water cyrculation systems. Ecological solutions |
| CHEMOPROJECT a.s., Czech Republic, Client AGROPOLYCHIM JSC 2011 | New unit for production of ammonium nitrate solution – 1250 ton/day | Plan for construction organization and execution. Health and Safety Plan. Construction-Mechanical documentation. |
| AGROPOLYCHIM JSC - DEVNYA 2011 | Unit Fertilizers - Reconstruction of Dry Section for ammonium nitrate solution production | Detailed design |
| AGROPOLYCHIM JSC - DEVNYA 2009 | Unit TSP / MAP / DAP - Department Lubrication of the finished product 65 t / hour | Detailed design |
| DEVNYA CEMENT JSC - DEVNYA 2008 | Installation for clinker and cement production - Reconstruction and Modernization – new electric cable route 6kV, – new sewerage route, – new industrial gas pipeline route - 6 atm, 6km | Detailed design |
| NEOCHIM JSC - DIMITROVGRAD 2008 | Ammonium bicarbonate Unit - Storage expansion | Basic design |
| AGROPOLYCHIM JSC - DEVNYA 2008 | New tank storage for UAN liquid fertilizer - 20000 t | Detailed design |
| AGRIA JSC - PLOVDIV 2008 | Ditiocarbamate Storage Expansion - tanks for liquid raw materials-carbon disulfide, sodium hydroxide and ethylenedialine | Detailed design |
| DEVNYA CEMENT JSC - DEVNYA 2007 | Installation for clinker and cement production - Reconstruction and Modernization | Investment design project-Basic design. Obtaining Construction permit. |
| CUMERIO MED JSC - PIRDOP 2007/2006 | Gas Supply of process air / for fuel oil burners / from smelter | Feasibility Study |
| „АГРОПОЛИХИМ“ АД ДЕВНЯ 2007/2006 | New installation for phosphoric acid - Evaporation. Tank storage for conc. P2O5 | Detailed design |
| CUMERIO MED JSC - PIRDOP 2007/2006 | New refinery for cathode copper– 180 000 t/y | Basic, Technical and Detailed design. Delivery of equipment. |
| NEOCHIM JSC - DIMITROVGRAD 2007/2006 | Neochim 21 century – Reconstruction and Modernization | Feasibility Study Pipelines Support Calculations, Pipe Rack 2 |
| UMICOR MED JSC - PIRDOP 2005 | Purification of free metallurgical gases. Lime milk preparation Installation | Detailed design. Deliveries. Commissioning-supervision |
| HOLSIM BULGARIA - BELI IZVOR 2005 | Beli Izvor Kiln Upgrading - Fine coal handling and dosing extension | Detailed design. Construction-Machine documentation |
| AGROPOLYCHIM JSC - DEVNYA 2004 | Unit Triple superphosphate for MAP / DAP / NPK production - Reconstruction | DD |
| SOLVAY SODI JSC - DEVNYA 2004 | Pumping station for fresh water | DD |
| UMICOR MED JSC - PIRDOP 2003 | Anode slimes processing plant | FS |
| UMICOR MED JSC - PIRDOP 2003 | Unit Electrolysis production - Regenerative departments - Reconstruction | DD |
| HOLDERBANK, BELI IZVOR CEMENT 2002 | Coal Preparation and Grinding Unit - Modification of the coal / petrocoke dosing system | DD. TS |
| SOLVAY SODI JSC - DEVNYA 1997-1998 | Dense soda ash production plant - Extension | Detailed design. Technical support. Sub-contractor of SNC Lavalin,Belgium |
| Legend: Preliminary design – PD Feasibility study – FS Technical support – TS Detailed design – DD Equipment delivery – D | ||