Environmental projects

CHIMCOMPLECT ENGINEERING JSC

Featured Below Is A Gallery Of Some Of Our Resent Completed Projects

ПСОВ Свилоцел

SVILOCELL EAD - SVISHTOV 2017/2018

HAGER + ELSASSER /H+E/, Germany, Engineering – Design and construction of biological stage to the existing WWTP – 14.400 cubic meters / day. Conceptual design – authorization of basic project

See more
Пречиствателна станция Аурубис

AURUBIS BULGARIA JSC - PIRDOP 2018

Conceptual design / based on the EnviroChemie, Germany, conceptual design / and Technical design for Optimization of the sedimentation process in the third stage of the Wastewater Treatment Plant for production

See more

Completed Projects

en_GBEnglish

Ние използваме бисквитки, за да гарантираме, че ви предоставяме най-доброто изживяване на нашия уебсайт. Ако продължите да използвате този сайт, ще приемем, че приемате Privacy policy