SVILOCELL EAD - SVISHTOV 2017/2018
HAGER + ELSASSER /H+E/, Germany, Engineering – Design and construction of biological stage to the existing WWTP – 14.400 cubic meters / day. Conceptual design – authorization of basic project
AURUBIS BULGARIA JSC - PIRDOP 2018
Conceptual design / based on the EnviroChemie, Germany, conceptual design / and Technical design for Optimization of the sedimentation process in the third stage of the Wastewater Treatment Plant for production
Completed Projects
Environmental projects
Environmental projects
Client | Type and capacity of the installation | Type of engineering service |
“БУЛГАРТРАНСГАЗ” ЕАД – СОФИЯ 2007 | Preparation of Application for Permit on Integrated Pollution Prevention and Control (IPPC) for 6 Compressor Stations - Kardam, Provadiya, Loznets, Strandja, Ihtiman and Petrich | Consulting services |
“КЕРАМАТ” АД – КАСПИЧАН 2005 | Preparation of Application for Permit on Integrated Pollution Prevention and Control (IPPC) for brick plants in Kaspichan, Vetrishte and Divdyadovo | Consulting services |
“ВИДАХИМ” АД – ВИДИН 2005 | Industrial waste dumb | Consultancy. Program for complaince with regulatory requirements |
“ВИДАХИМ” АД- ВИДИН 2004 | Preparation of Application for Permit on Integrated Pollution Prevention and Control (IPPC) for Heat Power Station "Vidachim" | Consulting services |
“СТРОЙКЕРАМИКА” АД МЕЗДРА 2004 | Preparation of Application for Permit on Integrated Pollution Prevention and Control (IPPC) for brick plants in Mezdra and Vratsa | Consulting services |
“ТЕРРА 2000” ООД ПЛЕВЕН 2004 | Preparation of Application for Permit on Integrated Pollution Prevention and Control (IPPC) for brick plants in Lukovit and Cherven bryag | Consulting services |
BALKAN ENVIRONMENTAL SCIENTIFIC AND EDUCATIONAL CENTER - SOFIA 2003 | Action plan on decontamination of Persistent Organic Pollutants (POPs) | Feasibility study |
ЕКО “ЕЛШИЦА” ЕООД- ЕЛШИЦА 2001 | Elshitsa waste water basin. Capsulation and recultivation. | Environmental Impact Assessment /EIA/ |
“EQE BULGARIA” АД – СОФИЯ 2002 | Heat Power Station Maritsa-East 2 - Feasibility study for utiltization and disposal of FGD gypsum | Preliminary Report |
MINISTRY OF ENVIRONMENT AND WATER 1997 | Proposal for Rehabilitation of Coal-field Wastes near Tvarditsa | PHARE Project BG9310-03-05-03 |