Inorganic chemical industry plants. Non-ferrous metallurgy plants
CHIMCOMPLECT ENGINEERING JSC
Featured Below Is A Gallery Of Some Of Our Resent Completed Projects
AGROPOLYCHIM JSC - DEVNYA 2017
Feasibility study and Detailed design – Reconstruction of phosphorite trestle construction, transshipment station and unloading unit
AGROPOLYCHIM JSC - DEVNYA 2017
Detailed design – Collection and utilization of wastewater from MAP production, DAP and new productions of NP and NPK. New sewer shafts with
AGROPOLYCHIM JSC - DEVNYA 2017
Detailed design for reconstruction of NPK production(S) in the TSP / MAP / DAP Unit
AURUBIS BULGARIA JSC - PIRDOP 2016/2017
Preliminary and Detailed design for installation and site communications for cooling of copper slag
NEOCHIM JSC - DIMITROVGRAD 2019
Project part MM - replacement of pump pos. H-35/1 and connection to existing pipelines
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2017
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2015 Вид и капацитет на инсталацията Избор и монтаж на система за улавяне на метални късове на ГТЛ СТ-6 в
Completed Projects
Inorganic chemical industry plants. Non-ferrous metallurgy plants
Inorganic chemical industry plants. Non-ferrous metallurgy plants
Client | Type and capacity of the installation | Type of engineering service |
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2015 | Две нови сорбционни колони в цех “Сорбционна инсталация” | Conceptual solution, Detailed design and author's supervision |
“КОНТУР ГЛОБАЛ -МАРИЦА ИЗТОК 3” АД -с.МЕДНИКАРОВО 2015 | Chemical Storage. Storage for used oils - reconstruction and improvement | Detailed design |
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2015 | Преустройство и ремонт на стаи на сграда “Управление 1” Хидроизолация Sarnafil на покрив на сграда “Управление 1” | Conceptual solution and Detailed design Detailed design and author's supervision |
“ТЕХНОМЕТАЛ” ЕООД – София, 2015 г. | “Солвей Соди” АД,Девня – КМ и КМД документация за метални конструкции на площадка за електрофилтър | Detailed design |
“АУРУБИС БЪЛГАРИЯ” АД – Пирдоп 2015 г. | Installation for Deep Bleed Treatment Plant – 4-7.7 mª / hour | Detailed design |
SNC LAVALIN / “ХАРМОНИ 2012” гр. Кърджали 2014 г. | Zinc Smelter Plant - Modernization and expansion. New Roasting Plant and Sulfuric Acid | Technical Design Basic design of Outotec |
“АГРОПОЛИХИМ” АД гр.Девня 2014 г. | Подобрения в производство МАР в цех “TSP/МАР/DAP” | Detailed design Basic design of INCRO |
“АУРУБИС БЪЛГАРИЯ” АД – гр.Пирдоп 2014/2015 г. | Bleed Treatment Plant for NiSO4 | Basic design |
“АУРУБИС БЪЛГАРИЯ” АД – гр.Пирдоп 2013/2014 г. | Монтаж и пуск на филтър-преса за фаялит в цех “Обогатителна фабрика” – 200 000 т/г. | Detailed design |
“КОНТУРГЛОБАЛ – МАРИЦА ИЗТОК 3” АД с. Медникарово 2014 г. | Fresh oils room - Reconstruction | Detailed design |
“ТЕХНОМЕТАЛ” ЕООД – София 2014 г. | “Солвей-Соди” АД-Девня, МК документация за резервоари под налягане – 36 м³ | Detailed design |
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2013 | Choosing and mounting of separating system for metal pieces from mineral ore class 35(40)+10mm | Detailed design |
“АГРОПОЛИХИМ” АД – ДЕВНЯ 2013 | Cooler upgrade for Solex finished product | Detailed design |
“АСАРЕЛ МЕДЕТ” АД -ПАНАГЮРИЩЕ 2013 | Movable Maintenance Hall for Cyclic Flow Technology II | Detailed design |
“МОНТАЖ КОМПЛЕКТ ИНЖЕНЕРИНГ” АД – СОФИЯ 2013 | Производствена база “Кремиковци” – противопожарен водопровод с ПП резервоар и помпена станция | Detailed design |
“АУРУБИС БЪЛГАРИЯ” АД – ПИРДОП 2012/2013 | New fuel oil station - power supply anode furnaces- 2.2 t / hour | Detailed design |
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2012/2013/2015 | Реконструкция и модернизация на кухня-майка със столова в АБК”Рудник” и 2 броя разливни и столови помещения /2000 души/дневно/ | Basic and Detailed design |
“АСАРЕЛ МЕДЕТ” АД – ПАНАГЮРИЩЕ 2012/2013 | New maintenance site for repairing of ore machines-area 5.4dkr | Detailed design |
“АУРУБИС БЪЛГАРИЯ” АД – ПИРДОП 2012/2013 | Thickener with diameter 6m and binding connections to WWTP | Detailed design |
“КОНТУР ГЛОБАЛ -МАРИЦА ИЗТОК 3” АД -с.МЕДНИКАРОВО 2012 | Tank for emergency collection of chemical compounds and solutions, for discharging tank for FeCl3 – V=7m³ | Technical and Detailed design. Author's supervision |
“АГРОПОЛИХИМ” АД – ДЕВНЯ 2011 | New unit for production of ammonium nitrate solution – 1250 ton/day | Detailed design - parts Technological and communications /piping/, Water cyrculation systems. Ecological solutions |
CHEMOPROJECT a.s., ЧЕХИЯ за “АГРОПОЛИХИМ” АД 2011 | New unit for production of ammonium nitrate solution – 1250 ton/day | Plan for construction organization and execution. Health and Safety Plan. Construction-Mechanical documentation. |
“АГРОПОЛИХИМ” АД – ДЕВНЯ 2011 | Реконструкция на “Суха част” в цех “Торове” за производство на разтвор на амониев нитрат | Detailed design |
“АГРОПОЛИХИМ” АД – ДЕВНЯ 2009 | Цех за TSP/MAP/DAP Отделение “Омасляване на готов продукт” 65 т/час | Detailed design |
“ДЕВНЯ ЦИМЕНТ” АД ДЕВНЯ 2008 | Installation for clinker and cement production - Reconstruction and Modernization – new electric cable route 6kV, – new sewerage route, – new industrial gas pipeline route - 6 atm, 6km | Detailed design |
“НЕОХИМ” АД Димитровград 2008 | Ammonium bicarbonate Unit - Storage expansion | Basic design |
“АГРОПОЛИХИМ” АД ДЕВНЯ 2008 | New tank storage for UAN liquid fertilizer - 20000 t | Detailed design |
“АГРИЯ” АД ПЛОВДИВ 2008 | Ditiocarbamate Storage Expansion - tanks for liquid raw materials-carbon disulfide, sodium hydroxide and ethylenedialine | Detailed design |
“ДЕВНЯ ЦИМЕНТ” АД ДЕВНЯ 2007 | Installation for clinker and cement production - Reconstruction and Modernization | Investment design project-Basic design. Obtaining Construction permit. |
“КУМЕРИО МЕД” АД ПИРДОП 2007/2006 | Gas Supply of process air / for fuel oil burners / from smelter | Feasibility Study |
“АГРОПОЛИХИМ” АД ДЕВНЯ 2007/2006 | New installation for phosphoric acid - Evaporation. Tank storage for conc. P2O5 | Detailed design |
“КУМЕРИО МЕД” АД ПИРДОП 2007/2006 | New refinery for cathode copper– 180 000 t/y | Basic, Technical and Detailed design. Delivery of equipment. |
“НЕОХИМ” АД Димитровград 2007/2006 | Neochim 21 century – Reconstruction and Modernization | Feasibility Study Pipelines Support Calculations, Pipe Rack 2 |
“ЮМИКОР МЕД” АД ПИРДОП 2005 | Purification of free metallurgical gases. Lime milk preparation Installation | Detailed design. Deliveries. Commissioning-supervision |
“ХОЛСИМ БЪЛГАРИЯ” БЕЛИ ИЗВОР 2005 | Beli Izvor Kiln Upgrading - Fine coal handling and dosing extension | Detailed design. Construction-Machine documentation |
“АГРОПОЛИХИМ” АД ДЕВНЯ 2004 | Реконструкция на цех “Троен суперфосфат” за производство на MAP/DAP/NPK | DD |
“СОЛВЕЙ СОДИ” АД – ДЕВНЯ 2004 | Pumping station for fresh water | DD |
“ЮМИКОР МЕД” АД- ПИРДОП 2003 | Anode slimes processing plant | FS |
“ЮМИКОР МЕД” АД – ПИРДОП 2003 | Регенеративни отделения в цех “Електролизно производство” | DD |
“БЕЛОИЗВОРСКИ ЦИМЕНТ” HOLDERBANK 2002 | Coal Preparation and Grinding Unit - Modification of the coal / petrocoke dosing system | DD. TS |
“СОЛВЕЙ СОДИ” АД – ДЕВНЯ 1997-1998 | Dense soda ash production plant - Extension | Detailed design. Technical support. Sub-contractor of SNC Lavalin,Belgium |
Legend: Preliminary design – PD Feasibility study – FS Technical support – TS Detailed design – DD Equipment delivery – D |