AURUBIS BULGARIA JSC - PIRDOP 2018

CHIMCOMPLECT ENGINEERING JSC

Пречиствателна станция Аурубис

Conceptual design / based on the EnviroChemie, Germany, conceptual design / and Technical design for Optimization of the sedimentation process in the third stage of the Treatment Plant for production waste water - capacity 120m3 / hour, usage of 4 new sand filters.

Other projects

GLAVBOLGARSTOY INTERNATIONAL 2019-2023

Investment design, materials and equipment procurement, construction and put in operation of Stage 1 Compressor Station "Rasovo" -3units x 12 MW and Stage 2 Compressor Station Nova Provadiya - 4 units x 10MW.

Joint Venture "INTERNATIONAL GAS" 2020-2023   

Gas Interconnection Bulgaria-Serbia. Stages: gas pipeline, 5 Ball Valves Stations, 2 Distribution Stations, 2 Pigging Stations and Gas metering Station Kalotina. Capacity - 5.5 mill cub.m/day, Length-62 km Pressure 54 бbar, DN 700

en_GBEnglish

Ние използваме бисквитки, за да гарантираме, че ви предоставяме най-доброто изживяване на нашия уебсайт. Ако продължите да използвате този сайт, ще приемем, че приемате Privacy policy