HAGER + ELSASSER /H+E/, Germany, Engineering – Design and construction of biological stage to the WWTP – 14.400 cubic meters / day. Conceptual design – authorization of H + E basic design. Detailed design and author's supervision in all design parts. Basins: MBBR /Moving Bed Biofilm Reactor (D=17,90m), Activated sludge reactor (D=28m), Degassing tank (D = 7m ), Secondary precipitator (D=39,2m)
GLAVBOLGARSTOY INTERNATIONAL 2019-2023
Investment design, materials and equipment procurement, construction and put in operation of Stage 1 Compressor Station "Rasovo" -3units x 12 MW and Stage 2 Compressor Station Nova Provadiya - 4 units x 10MW.