SVILOCELL EAD - SVISHTOV 2017/2018

CHIMCOMPLECT ENGINEERING JSC

ПСОВ Свилоцел

HAGER + ELSASSER /H+E/, Germany, Engineering – Design and construction of biological stage to the WWTP – 14.400 cubic meters / day. Conceptual design – authorization of H + E basic design. Detailed design and author's supervision in all design parts. Basins: MBBR /Moving Bed Biofilm Reactor (D=17,90m), Activated sludge reactor (D=28m), Degassing tank (D = 7m ), Secondary precipitator (D=39,2m)

Reference

Other projects

GLAVBOLGARSTOY INTERNATIONAL 2019-2023

Investment design, materials and equipment procurement, construction and put in operation of Stage 1 Compressor Station "Rasovo" -3units x 12 MW and Stage 2 Compressor Station Nova Provadiya - 4 units x 10MW.

Joint Venture "INTERNATIONAL GAS" 2020-2023   

Gas Interconnection Bulgaria-Serbia. Stages: gas pipeline, 5 Ball Valves Stations, 2 Distribution Stations, 2 Pigging Stations and Gas metering Station Kalotina. Capacity - 5.5 mill cub.m/day, Length-62 km Pressure 54 бbar, DN 700

en_GBEnglish

Ние използваме бисквитки, за да гарантираме, че ви предоставяме най-доброто изживяване на нашия уебсайт. Ако продължите да използвате този сайт, ще приемем, че приемате Privacy policy