“НЕОХИМ” АД – ДИМИТРОВГРАД 2019

CHIMCOMPLECT ENGINEERING JSC

Неохим-Димитровград

“НЕОХИМ” АД – ДИМИТРОВГРАД 2019

Type and capacity of the installationReplacement pipe from the line 739. Preparation of machine-structural documentation for the pipeline – diam. DN 250, pressure 10,55 MPa
Type of engineering serviceWorking design for a new fabrication.

Other projects

GLAVBOLGARSTOY INTERNATIONAL 2019-2023

Investment design, materials and equipment procurement, construction and put in operation of Stage 1 Compressor Station "Rasovo" -3units x 12 MW and Stage 2 Compressor Station Nova Provadiya - 4 units x 10MW.

Joint Venture "INTERNATIONAL GAS" 2020-2023   

Gas Interconnection Bulgaria-Serbia. Stages: gas pipeline, 5 Ball Valves Stations, 2 Distribution Stations, 2 Pigging Stations and Gas metering Station Kalotina. Capacity - 5.5 mill cub.m/day, Length-62 km Pressure 54 бbar, DN 700